Project List >24” pipeline in kharg island
Project title: 24” pipeline in kharg island Location: kharg island, Persian Gulf Client: Iranian offshore Oil company Jab summary: Fabrication and Installation of 2000 m of carbon steel 24” pipeline onshore Kharg island. Main Job steps include: § Design and installation engineering § Right of way execution § Sand blast &anti- corrosion coating of all pipe joints § Cold bending of pipe joints at site ( up to 15 ) § Installation of insulation joints at two tie-in points § Pipeline crossing with roads § Cathodic protection of pipeline § Pipeline hydro test / pre commissioning
major equipments involved § D9 side booms § Earthwork machinery § Bending machines § Diesel generator and welding machines |
||
|
|
![]() |
|