AB-GCP Top Deck Offshore installation, Shipped loose items and offshore construction management.
Main Job steps include:
- Installation of Deck and Bridge
- Preparation and submission of offshore installation manual and procedures
- Offshore construction management for Deck and Bridge installation
|
|
B-GCP Top Deck Offshore installation, Shipped loose items and offshore construction management.
Main Job steps include:
- Installation of Deck and Bridge
- Preparation and submission of offshore installation manual and procedures
- Offshore construction management for Deck and Bridge installation
|
|
Job summary:
Fabrication of the structures of offshore platform (WHP) relevant to the south pars gas development project phase 16
Main Job steps include:
- Cutting and Beveling Plates and other Structures
- Fabricating Top deck floors (Fitup, Welding and NDT)
- Sand blast and Painting
|
|
|
|
Job summary:
As a part of ongoing development of the Aboozar and Bahregansar Fields, Atlas Offshore has installed three Gas Compression Platforms (GCP’s)
- Aboozar Gas Compression Platform (AB-GCP), Aboozar Field
- Bahregansar Gas Compression Platform (B-GCP), Bahregasar Field.
- Bridge support (BST), Bahregansar Field
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|