AB-GCP Top Deck

 

       AB-GCP Top Deck Offshore installation, Shipped loose items and offshore construction management.

      Main Job steps include:

  • Installation of Deck and Bridge
  • Preparation and submission of offshore installation manual and procedures
  • Offshore construction management for Deck and Bridge installation
AB-GCP Top Deck

       B-GCP Top Deck Offshore installation, Shipped loose items and offshore construction management.

      Main Job steps include:

  • Installation of Deck and Bridge
  • Preparation and submission of offshore installation manual and procedures
  • Offshore construction management for Deck and Bridge installation
Top Deck Fabrication (SPD16)

Job summary:


     Fabrication of the structures of offshore platform (WHP) relevant to the south pars gas development project phase 16

Main Job steps include:

  • Cutting and Beveling Plates and other Structures
  • Fabricating Top deck floors (Fitup, Welding and NDT)
  • Sand blast and Painting

 

Top Deck Fabrication (SPD16)
  AB-GCP, B-GCP and BST Jacket Installation    AB-GCP, B-GCP and BST Jacket Installation
AB-GCP, B-GCP and BST Jacket Installation

Job summary:
As a part of ongoing development of the Aboozar and Bahregansar Fields, Atlas Offshore has installed three Gas Compression Platforms (GCP’s)

  • Aboozar Gas Compression Platform (AB-GCP), Aboozar Field
  • Bahregansar Gas Compression Platform (B-GCP), Bahregasar Field.
  • Bridge support (BST), Bahregansar Field